Boduli Rijeka – Superyacht pier

At the beginning of summer 2014 Marinetek NCP performed an installation od anchoring blocks and soon after installation of floating pier in Rijeka port. This is the project of Port Authority Rijeka and 4,3 M kn worth investment, whose main goal is to increase the capacity of the mooring. Works on construction and installation of piers are successfully done by Marinetek NCP and BSK Commerce from Rijeka, whose joint offer was selected in public proceedings issued by Port Authority. 

The 80 m long floating pier is made of four breakwater pontoons type M3820BRS, each of which is nearly twenty meters long and three and a half meters wide, and should increase capacity of the mooring in the harbour for about 50%. 
Pier is bounded for massive coastal construction with cross chain link with inserted inox/rubber spring inserted in order to prevent larger movement of the piers. Pontoons are equipped with access bridges, cleats and service cabinets with double water and electricity plugs. On client`s request all pontoons have rubber fenders. 

Anchoring system consists of crossed-anchored lines made with Seaflex system, anchored to massive blocks of 99 tons, which will enable safe mooring of large vessels even during poor weather condition.  

Rijeka-Riva-Boduli-2Rijeka-Riva-Boduli-2
Rijeka-Riva-Boduli-bitvaRijeka-Riva-Boduli-bitva
Rijeka-Riva-Boduli-mostićRijeka-Riva-Boduli-mostić
Rijeka-Riva-Boduli-heavy-dutyRijeka-Riva-Boduli-heavy-duty
Rijeka-Riva-Boduli-1Rijeka-Riva-Boduli-1

TECHNICAL CHARACTERISTICS

Project:
superyacht pier Riva Boduli
Location
Rijeka, Croatia
Investor:
Port Authority Rijeka
Works:
design, production, delivery and installation of floating pier made of breakwater pontoons type M3820BRS
Budget:
4,3 mil Kn
Date of completion:
2014.

The basic purpose of new built pier and mooring system is the acceptance of popular tourist sailing boats during summer months. Namely, these sailing boats usually bind to coats Boduli in Rijeka port and the problem was that the coast wasn`t long enough so sailboats had to bind to each other. For the rest of the year, these berths are intended for mega yachts. Anchoring system provides safe berths during winter months, for 9 yachts up to 35 m long and 5 yachts up to 5 m long, as well as for vessels of Police Deparment, Port Authority and Harbour Master. 

NEWS
PONTOON ELEMENTS
Bill-Green
The finished product is a tribute to all concerned...and it is a great point of reference for Marinetek.
Bill Green
Technical & Projects Director
Camper & Nicholsons Marinas Ltd
doris-perucic
For many years ACI Club has reliable partner in MARINETEK NCP and their „know-how“ – „float-how“ approach is always assurance to have the best solutions, technology and quality possible.
Doris Peručić
Member of the board – CEO
ACI d.d.
Sven-Delic-1024x682-1
Marinetek NCP delivered in extremely short term of 4 months 4 new pontoons to marina Agana that offer safety, stability and commodity to our clients. We are utterly satisfied with their services, competence and efficiency.
Sven Delić
Član uprave
JAHTING SPORT AGANA d.o.o
goran-raznjevic-2
At Marinetek NCP, we primarily got a partner with whose support, knowledge and experience Marina Kornati Ilirija d.d. will remain one of the three leading nautical ports on the Adriatic. It will also enrich and modernize our marina by the implementation of the best technical solutions.
Goran Ražnjević
President od the board
Ilirija d.d.

NEED ASSISTANCE?

Get in touch with us.

Skip to content