Skip to content

ACI marina Rovinj

Marina Rovinj, in which more than HRK 150 million has been invested, is the largest investment in ACI’s, until 2019. It is the most modern marina which ACI has in the Adriatic and is categorized like first five anchors marina. Two main baisns, one for vessels in transit and the other for vessels on an annual basis, have a total of 196 berths for an average length of 17 meters, with the possibility of accommodating yachts to 35 meters in length and much longer vessels in transit.

Marinetek has completed the works on the design, delivery and installation of floating pontoon pierss, equipment and anchorage system in the agreed and planned terms. Four piers, 57m, 69m, 75m, and 54 meters long, have been constructed, transported and anchored. All docks are made of the standard Marinetek Heavy Duty pontoon elements type M3300HD, with a total width of 3.3m, with adequate equipment. Pontons are additionally equipped with high quality WPC decking in two shades of grey colors. The fenders along side pontoons are made of PE elastic material in the color of the walking surface.

cam14cam14
decking-and-bridge-2decking-and-bridge-2
Rovinj_Marina_3Rovinj_Marina_3
Rovinj_Marina_2Rovinj_Marina_2
final-work-on-decking-rovinjfinal-work-on-decking-rovinj

TECHNICAL CHARACTERISTICS

Project:
ACI Marina Rovinj
Location:
Rovinj
Investor:
ACI club d.d.
Works:
building and installation
Budget:
1.350.000 €
Delivery:
March 2019.
Products:
Marinetek Heavy Duty pontoons, Type M3300HD, bridges and bollards from Stainless steel, WPC high resistance decking, PU elastic fenders in colour

The piers are equipped with access bridges 1.2m wide and 6m long with fences and handholders made of stainless steel, and a walkable surface of the same WPC decking as on pontoons.
Stainless steel mooring bollards of appropriate size and all the equipment and materials needed to ensure the stability and safety of pontoons and yachts on mooring berths are installed on the piers.
For the anchoring of pontoons, a standard system with mooring chains and anchors was used, all in accordance with the Design of the piers and anchoring, respectively in accordance with the CRS Technical requests. For anchoring of the yachts, Mediterrannean mooring system has been installed.

This long-awaited completion of the work was very welcomed by the yacht owners, since the interest for the mooring berth in Rovinj is enormous. In effort to achieve the highest standard of services in this branch of tourism in Rovinj, it offers a service that was so far lacked in the nautical sector, attracting new categories of guests and offering a service that matches the highest level. Yacht owners will have here really everything they need and why they want to stay in this marina.

NEWS
PONTOON ELEMENTS
Bill-Green
The finished product is a tribute to all concerned...and it is a great point of reference for Marinetek.
Bill Green
Technical & Projects Director
Camper & Nicholsons Marinas Ltd
doris-perucic
For many years ACI Club has reliable partner in MARINETEK NCP and their „know-how“ – „float-how“ approach is always assurance to have the best solutions, technology and quality possible.
Doris Peručić
Member of the board – CEO
ACI d.d.
Sven-Delic-1024x682-1
Marinetek NCP delivered in extremely short term of 4 months 4 new pontoons to marina Agana that offer safety, stability and commodity to our clients. We are utterly satisfied with their services, competence and efficiency.
Sven Delić
Član uprave
JAHTING SPORT AGANA d.o.o
goran-raznjevic-2
At Marinetek NCP, we primarily got a partner with whose support, knowledge and experience Marina Kornati Ilirija d.d. will remain one of the three leading nautical ports on the Adriatic. It will also enrich and modernize our marina by the implementation of the best technical solutions.
Goran Ražnjević
President od the board
Ilirija d.d.

NEED ASSISTANCE?

Get in touch with us.

Skip to content