Work on the construction of the Marina Draga began in the spring of 2022, and by mid-August the most significant excavations on the coast and the largest part of the coastal wall were completed. In the first phase of assembly, Marinetek Adriatic delivered and installed 13 Heavy Duty pontoons with associated mooring fingers.
At the request of the investor, instead of the planned fixed breakwater on concrete piles, we made and installed a floating breakwater composed of ‘mega breakwaters’, the largest breakwaters ever made for the Croatian market. Elements with a width of 6 meters, a length of 20 meters and a total height of 2.4 meters and a weight of almost 90 tons are designed to protect water areas in ports and marinas from waves of a significant height of up to about 1.5 meters. The galvanized steel elements and reinforcements alone weigh almost 6 tons. We delivered as many as 14 new concrete elements to Marina Draga by November 2022, for about a third of the price of a standard fixed breakwater.














TECHNICAL CHARACTERISTICS
Project: | Marina Drage |
---|---|
Location: | Drage |
Capacity: | 200 berths |
Works: | total of 435 meters of HD pontoons 3 meters wide, equipped with fingers and equipment for mooring of vessel |
Budget: | 2 mil € |
Date of completion: | 2023. |
Products: | Heavy Duty pontoons and M6320BRK |
The official opening of the marina is scheduled for the spring of 2023, when the service and catering facilities are planned to be completed.