Port Račišće

After the Porto UŠ project, where Marinetek Adriatic delivered pontoon docks for a total of 99 berths for the local population for the port authority of Korčula, successful cooperation has continued with the plan to organize the communal part of the Port of Račišće.

The contract for this project was signed in September 2021, and three months later, the complete pier, which constitutes the first phase of the work, arrived in Račišće. The total length of the pier is 48 meters and it is used for mooring about 30 boats.
As part of the second phase of the work, the existing docks were re-arranged and a new anchoring system was installed, so that at the end the port of Korcula Račišće got 74 completely new moorings arranged.

Račišće 1Račišće 1
RačišćeRačišće
Račišće2Račišće2

TECHNICAL CHARACTERISTICS

Project:
Port Račišće
Location:
island of Korčula, port Račišće
Capacity:
74 berths
Works:
construction and installation of piers with anchor systems
Budget:
2 mil kn
Date of completion:
2022.
Products:
M3316BRK
NEWS
PONTOON ELEMENTS
Bill-Green
The finished product is a tribute to all concerned...and it is a great point of reference for Marinetek.
Bill Green
Technical & Projects Director
Camper & Nicholsons Marinas Ltd
doris-perucic
For many years ACI Club has reliable partner in MARINETEK NCP and their „know-how“ – „float-how“ approach is always assurance to have the best solutions, technology and quality possible.
Doris Peručić
Member of the board – CEO
ACI d.d.
Sven-Delic-1024x682-1
Marinetek NCP delivered in extremely short term of 4 months 4 new pontoons to marina Agana that offer safety, stability and commodity to our clients. We are utterly satisfied with their services, competence and efficiency.
Sven Delić
Član uprave
JAHTING SPORT AGANA d.o.o
goran-raznjevic-2
At Marinetek NCP, we primarily got a partner with whose support, knowledge and experience Marina Kornati Ilirija d.d. will remain one of the three leading nautical ports on the Adriatic. It will also enrich and modernize our marina by the implementation of the best technical solutions.
Goran Ražnjević
President od the board
Ilirija d.d.

NEED ASSISTANCE?

Get in touch with us.

Skip to content